The complete system consists of:
- Funnel hopper to convey the concrete
- Swivel head to facilitate the lifting and laying of the pipes
- Non-slip platform
- Tie to prevent the pipes from slipping into the bored hole
- Pipe storage rack, useful for facilitating transfer operations from one site to another
- Tightening key
- Extraction key
Tremie pipe elements are connected by M/F joints.